Neibu Sports. Waterproof measures should be taken before and after construction of sports wooden floor venues

1) At the architectural design level of the gymnasium, the hidden dangers of water seepage and floating rain should be considered, and the architectural design scheme should be fully improved;
2) During the construction process, it is necessary to strictly do waterproof and moisture-proof treatment to ensure that the building does not leak or seep;
3) During the later operation and maintenance of the gymnasium, it is necessary to regularly check the water pipes and lines to strengthen the venue management; put an end to the use of sports wooden floors
Sports wooden floor structure
YOU MAY ALSO LIKE
- 2024-11-13
- 115 read
Basketball hall sports wooden floor construction case real shot renderings
- 2024-11-13
- 115 read