For all kinds of stadiums and theater stages, floor coverings are critical. There is a saying in the industry, "Three points of floor, seven points of installation". The installation quality of the wooden floor of the gymnasium is very important for the gymnasium. The installation of the wooden floor of the gymnasium is a very professional project, which requires a professional installation team and a complete installation and construction process.
NB sports wood floor engineers for everyone to popularize science, before the official installation of the stadium wood floor, we must make full preparations, such as doing some necessary inspections:
1. Check the ground flatness
If the ground flatness is not up to standard and the paving is carried out, it will cause problems such as floor collapse, warping, arching, and noise. During the inspection, you can use a 2M ruler to lay flat on the inspection ground, and use a 3mm thick feeler gauge to check the gap between the ruler and the ground. If the ground is uneven, it needs to be leveled with a shovel. In serious cases, it needs to be re-leveled or self-leveling.
2. Check the ground moisture content
Check the water content index of the ground and floor, because if the water content of the ground is too high, the floor will easily absorb water and expand, causing problems such as arching, drumming, and noise of the floor. During inspection, the moisture content of the ground can be measured with a moisture content tester. The standard requirement for ordinary ground is <20%, and the requirement standard for floors with geothermal heating is <10%.
3. Check the waterproof measures
After the moisture content is checked, it is necessary to ensure that the waterproof measures are well protected. The wooden floor is most afraid of water. After the floor is invaded by water, there will be a series of problems such as foaming, degumming, and deformation, making it unusable.
4. Check the ground firmness
Make sure the floor is firm. If the ground is not solid, it may not affect at first, but after laying the floor for a period of time, it will be easy to make noise. So this is easy to ignore.
The NB sports wood floor engineer pointed out that after checking the above preparations in place, the paving of the gymnasium wood floor can be arranged. However, to prevent cross-construction, the construction period for laying the wooden floor of the gymnasium should preferably be staggered from other decoration construction periods. Try to lay the wooden floor of the gymnasium after the decoration is completed, because the cross-operation is likely to cause damage to the floor, which is not worth the loss.
NB sports wood flooring is a national brand in China's sports wood flooring industry. NB sports wood floor has long-term production and installation of basketball wood floor, badminton hall wood floor, volleyball hall wood floor, table tennis room wood floor, squash floor wood floor, gym wood floor, training hall wood floor, sports center wood floor, concert hall Wooden floors, various theater stage wooden floors, etc., have successfully installed more than 10,000 stadiums and theater stages for a long time.
NB sports wood floor engineers for everyone to popularize science, before the official installation of the stadium wood floor, we must make full preparations, such as doing some necessary inspections:
1. Check the ground flatness
If the ground flatness is not up to standard and the paving is carried out, it will cause problems such as floor collapse, warping, arching, and noise. During the inspection, you can use a 2M ruler to lay flat on the inspection ground, and use a 3mm thick feeler gauge to check the gap between the ruler and the ground. If the ground is uneven, it needs to be leveled with a shovel. In serious cases, it needs to be re-leveled or self-leveling.
2. Check the ground moisture content
Check the water content index of the ground and floor, because if the water content of the ground is too high, the floor will easily absorb water and expand, causing problems such as arching, drumming, and noise of the floor. During inspection, the moisture content of the ground can be measured with a moisture content tester. The standard requirement for ordinary ground is <20%, and the requirement standard for floors with geothermal heating is <10%.
3. Check the waterproof measures
After the moisture content is checked, it is necessary to ensure that the waterproof measures are well protected. The wooden floor is most afraid of water. After the floor is invaded by water, there will be a series of problems such as foaming, degumming, and deformation, making it unusable.
4. Check the ground firmness
Make sure the floor is firm. If the ground is not solid, it may not affect at first, but after laying the floor for a period of time, it will be easy to make noise. So this is easy to ignore.
The NB sports wood floor engineer pointed out that after checking the above preparations in place, the paving of the gymnasium wood floor can be arranged. However, to prevent cross-construction, the construction period for laying the wooden floor of the gymnasium should preferably be staggered from other decoration construction periods. Try to lay the wooden floor of the gymnasium after the decoration is completed, because the cross-operation is likely to cause damage to the floor, which is not worth the loss.
NB sports wood flooring is a national brand in China's sports wood flooring industry. NB sports wood floor has long-term production and installation of basketball wood floor, badminton hall wood floor, volleyball hall wood floor, table tennis room wood floor, squash floor wood floor, gym wood floor, training hall wood floor, sports center wood floor, concert hall Wooden floors, various theater stage wooden floors, etc., have successfully installed more than 10,000 stadiums and theater stages for a long time.