Zhoukou Gymnasium Floor Manufacturer Supplier How much is the wooden floor of Xinxiang indoor basketball court

The common keel laying method may appear that the ground is not leveled. The uneven ground will make some floors and keels hang in the air, and there will be a series of problems such as noise when stepping on it. These are important details.
NB sports wood floor engineer, for friends popular science stadium wood floor construction, four details to keep in mind:
Stadium wooden floor construction details 1: wooden keel for moisture-proof treatment
At present, the non-drying keel made of sawn and planed pine plank is usually used for construction. It is fixed on the ground about 30 days in advance, and no moisture-proof layer is laid between the ground and the keel. When it comes to laying the floor, it is laid directly without checking the moisture content of the keel. In fact, the moisture content of the keel is usually about 25% at this time, while the moisture content of the qualified wooden floor is generally about 12%. If the humidity difference is too large, the wooden floor will absorb moisture quickly, causing the wooden floor of the stadium to arch and accompanied by paint cracking. .
Stadium wooden floor construction details 2: The wooden keel is fixed with iron nails
During the construction, the fixing method of wedges and iron nails will cause insufficient nail holding force due to the too small contact surface between the wooden wedges and the iron nails.
Stadium wooden floor construction details three: assembly is too loose or too tight
The expansion and contraction of the wooden floor of the stadium changes with the change of the ambient temperature and humidity. Therefore, when formulating the plan for paving the wooden floor of the stadium, the tightness of the wooden floor should be reasonably arranged according to the ambient temperature and humidity of the place of use. If it is too loose, a larger gap will appear when the floor shrinks, and if it is too tight, the floor will arch when it expands.
Stadium wooden floor construction details four: cross-construction of decoration works
During construction, first lay the wooden floor, and then engage in other construction projects on the floor surface, which is the usual practice of the decoration team at present. In this way, after the floor is paved, it often takes a month or more to sand and paint. During this period, the floor is not isolated from the moisture and chemicals in the surrounding environment, which may cause the wooden floor to deform and crack due to the rapid change of moisture content.
NB sports wood flooring is a national brand in China's sports wood flooring industry. NB sports wooden floor has a professional installation team, paving every piece of stadium wooden floor with the spirit of craftsmanship, ensuring the paving quality of the stadium wooden floor. See the spirit for details. Welcome to NB sports wood flooring for consultation and on-site inspection.