Pay attention to the installation details of the wooden floor of the basketball court, which can improve the quality of the wooden floor of the basketball court

Pay attention to the installation details of the wooden floor of the basketball court, which can improve the quality of the wooden floor of the basketball court

Everyone is not very familiar with the products of basketball court wooden floor manufacturers, so it is very important to pay attention to product quality. In addition to product production quality, the quality of basketball court wooden floor installation is also very important.

nbfloor

The solid wood floor panel of the basketball court is made of high-quality hard maple board, and the bottom layer is composed of different types of elastic structures. The product has passed the standard German standard DIN test, European standard EN test, and national standard GB test. And it is a designated product for large-scale sports venues. It is a professional high-quality sports wood floor, suitable for basketball courts, volleyball, handball courts and other purposes. The raw materials of sports wood flooring produced by Beijing NB Flooring are all made of high-quality molded wood, and are produced through strict factory procedures and advanced technology to maximize the potential advantages of these woods. It has been certified by the Sporting Goods Testing Center and the National Sporting Goods Federation. Most of its materials are maple, beech and oak, which are accepted by the majority of users for its "good wood and anti-deformation" characteristics. In order to enhance the quality of the surface layer of the sports floor system, our company adopts the famous brand Bona sports floor paint and its technology for surface treatment. Environmental protection, high wear resistance, prevent shoe marks and scratches, and meet the European sports floor anti-skid DIN18032 standard.


The basketball wooden floor has high requirements for installation technology and installation planning. It not only requires the ground to be flat, and the error is preferably within 2cm, but also requires the ground to be waterproof and the ground moisture content is moderate. There should be no cross construction during installation. After the indoor basketball wooden floor is installed, shrinkage joints must be left, otherwise the basketball wooden floor will bulge.
1. Check the quality of the panel before installation;
2. Lay the central floor one by one along the direction of the central keel. The surface is consistent with the design elevation, located in the center, and the edge is straight. After passing the test, it is reinforced from both sides. The central floor is tenon type on both sides. Nail steel nails every 400MM, and smash them into the floor without damaging the floor, and the nail holes are flat and smooth;
3. Lay other floors along both sides of the central floor at the same time. During the laying process, the adjacent floor joints are staggered. There should be a 3-5MM gap between the floor and the floor. Do not hit too tightly to prevent damage to the floor surface and edges; < br /> 4. When the floor needs to be cut off, the front side is down, the burr is on the back side, and the incision is smooth and neat;
5. The construction period should be arranged in a compact manner, pay attention to changes in the external environment, and pay special attention to the pollution of water, steam pollution or hard foreign objects, oils, dust, inflammables and other harmful substances on the floor. Do not enter the construction site with permission, strengthen the supervision of the construction site;
6. For the installation of skirting boards, use steel nails to be nailed into anti-corrosion wood bricks to fix, the nail heads are smashed into the wood, and the nail holes are leveled;
7. The skirting boards should be arranged reasonably, and the joints of the air vents should be uniform. The joints of the skirting boards at the corners of the buildings should be cut at a 45-degree angle, the incisions should be straight, smooth, and the joints should be tight; when installing the skirting boards, pay attention to cleaning the sundries in the ventilation slots;


8. Coordinate with related engineering interfaces when installing skirting boards
The installation procedure of the basketball wooden floor is very strict, and the hidden structure: a. There is a 3-5 cm solid wood pad between the keel and the ground, which plays a buffering role; b. There is a 15mm thick layer of native between the keel and the keel. The rubber shock-absorbing pad ensures that the friction between the keel and the keel will not be too large, avoids the "creaky" sound, and acts as a buffer. c. There is a layer of 0.5mm moisture-proof film between the basketball wooden floor and the multi-layer board, which plays the role of protecting the panel and preventing moisture.
Through the above introduction, pay attention to the installation details of the wooden floor of the basketball court, which will definitely improve the quality of the overall basketball wooden floor! ! !