Construction sequence of double keel solid wood sports floor

Construction sequence of double keel solid wood sports floor

Solid wood sports floor Construction:
1. Transport materials to the site
2. Pay-off
Pop up the keel position line according to the requirements of the wooden floor system, and move the wooden keel spacing of 400mm.
3. Install elastic shock-absorbing pads
The 15mm thick elastic rubber pad is the key component to ensure the vibration absorption of the sports floor. The installation position should be accurate to ensure that the entire floor system has uniform elasticity. The elastic rubber pad is installed between the ground and the bottom wooden keel with a spacing of 400mm.
4. Install the bottom wooden keel
Arrange the wooden keels at a distance of 400mm from the starting wooden keel to both sides, and level the whole. If the wooden keels are installed to the wall, no matter whether the distance meets 400mm, they need to be fixed at a distance of 20mm from the wall.
5. Install the upper wooden keel
On the bottom wooden keel, use rib nails to fix the three-dimensional cross and place it on an elastic rubber pad with a spacing of 400mm.
6. Laying multi-layer boards
Before laying the multi-layer wool board, the upward side of the wool board must be painted with fire-proof and anti-corrosion paint.
7. Laying moisture-proof membrane
8. Solid Wood Sports Floor Surface Pavement
The wood floor surface layer, the laying process adopts the traditional hand hammer beating method. Drill holes with a hand drill, and fix the rib nails at an angle, which can ensure that the deformation force of the floor caused by changes in ambient temperature and humidity can be evenly overcome, thereby avoiding warping of the wooden floor.
9. Installation of edge trim
The trim strips are fixed to the walls around the site with air gun nails.
10. Clean wood floors